Arabtec subsidiary wins Dh280m Saudi Aramco water disposal facility upgrade
- October 7, 2019
- Posted by: administrator
- Category: Companies, Tenders and Contracts, Middle East
Leading contractor for social and economic infrastructure Arabtec Holding PJSC, has announced that its subsidiary Target Engineering Construction Company has been awarded a SAR 280 million EPC contract by Saudi Aramco for the upgrade of a produced water disposal facility.
The scope of work to upgrade the existing water disposal unit at Qatif’s gas oil separation plant (GOSP-1) in Eastern Province, Saudi Arabia includes:
- installation of a water oil separation vessel;
- water disposal pumps;
- water injection pumps;
- low-pressure de-gassing tank water draw-off pumps
- a pipeline to transfer oily water from Ju’aymah Terminal to Qatif’s GOSP-1.
Arabtec’s Group Chief Executive Officer, Peter Pollard, commented:
‘We are pleased that Target has been awarded another project in the Kingdom of Saudi Arabia strengthening our longstanding relationship with Saudi Aramco. This award adds to our pipeline of projects in the industrial infrastructure sector, consistent with our strategic priority to diversify our backlog.’
Target Engineering is a wholly-owned subsidiary of the UAE’s biggest-listed contracting firm – Arabtec shares trade on the Dubai Financial Market.